Australian civil construction reference

Construction estimating information, built from how the work is done.

Plant productivity, construction methods, temporary works and cycle calculators for Australian civil and infrastructure work. Every figure shows its source and date, free to read.

Queensland first80 sources indexedNo figure without a source
25plant guides
16construction method guides
15temporary works guides
128work packages in 24 sectors
13productivity cycle calculators
80sources in the register

Counts from the current library.

From reference to a priced tender

Read it here. Measure it in Spark. Price it in Trinity.

Vaultix is the reference. Synthetik's software is where the estimate gets built: the same first-principles logic, from the drawing to the sell rate.

01 · Reference

Look it up in Vaultix

Find the method, the plant and crew, and the productivity band with its source. Free on the web.

Vaultix library
02 · Measure

Take off quantities in Spark

Calibrate the drawing once, then measure areas, lengths and counts straight off the PDF set, ready to price.

Spark PDF takeoff
03 · Price

Build the estimate in Trinity

First-principles build-ups of labour, plant and materials, then sell rates, cashflow and embodied carbon from the same lines.

Trinity estimating
Worked example

New rural sprayed-seal road

  1. VaultixFollow the rural sprayed-seal lot programme: subgrade, pavement, prime, seal. Read the grader, roller and water cart guides for output by activity and source.
  2. SparkCalibrate the plan and typical sections, then measure the pavement and seal areas and the shoulder lengths.
  3. TrinityBuild each item from crew, plant hours and materials, using the productivity bands. Trinity produces the sell rate, cashflow and carbon.
Spark · PDF measurement

Measure the drawings once, get quantities ready to price.

Spark is construction PDF software for takeoff and markup. Set the scale once, then measure areas, lengths and counts across the whole drawing set, with every measurement listed and labelled.

  • Area, length, perimeter and count tools on calibrated drawings
  • Quantities and comments on the same sheet, grouped by item
  • Works with the PDFs you already get from Bluebeam and Acrobat users
Spark measuring floor areas, a wall length and downlight counts on a calibrated architectural plan
Spark · areas, lengths and counts on a calibrated plan
Trinity · first-principles estimating

Price the work the way the library explains it.

Trinity is Australian estimating software for Windows. Build every rate from labour, plant, materials and productivity, then carry it through overheads, sell rates, cashflow and Scope 1, 2 and 3 carbon.

  • Direct costs, build-ups and resources with a live formula engine
  • Sell rates, PDF reports and cashflow from the same priced lines
  • Embodied carbon tracked against every item
Trinity direct costs sheet for a road upgrade with pavement, asphalt, kerb and line marking items
Trinity · direct costs for a road upgrade
Every figure says where it came from

Labelled, dated and never invented.

A value with no source stays “Not verified” and is shown that way. Market rates need supplier quotes.

Confirmed

Confirmed

Checked against the primary source and dated.

Not verified

Not verified

A typical value, or the document has not been found yet. Use with care.

Not found

Not found

Looked for and could not be found. Kept so it is not relied on.

Band · S-0xx

Band

Low, typical and high range, with the key of its library source.

Built by estimators, for estimators

Get the tools behind the library.

Vaultix is free to read. When it is time to measure and price the job, Spark and Trinity do it from the same first principles.